Office Moving Checklist: The Complete UK Business Relocation Plan

The complete 6-month office relocation checklist for UK businesses — IT, staff, HSE, insurance, address changes and how to keep trading through the move.
FIXED PRICE · NO OBLIGATION

Get your quote in 60 seconds

Total transparency · Zero hidden costs from £250

We only move properties with 2 to 5+ bedrooms.

SSL Secured GDPR Compliant
OFFICE REMOVALS12 MIN READ

Office relocations fail for one reason above all others: they're planned by someone whose full-time job is not planning office relocations. That's the whole reason a market for specialist commercial movers exists. This checklist is the master plan our own Apex commercial coordinators build from — feel free to adapt it to your business.

Six months out

  • Formal board or leadership approval, budget and timeline signed off.
  • Appoint an internal move manager with dedicated time (5–10 hrs/week).
  • Notify landlord of intent to vacate in line with lease dilapidations clause.
  • Instruct a commercial property solicitor to review the new lease.
  • Book a specialist commercial removals company for a walk-through and quote.
  • Announce the move to staff — silence causes more resignations than the move itself.

Three months out

  • Detailed floorplan of new premises with numbered desks, meeting rooms, storage.
  • IT audit: server racks, switches, printers, meeting-room hardware, workstations, laptops, phones.
  • Book telecoms provider transfer (leased lines run 60–90 days).
  • Book new-office furniture reconfiguration or purchase.
  • Confirm business insurance covers both addresses during the transition window.

One month out

  • Notify HMRC, Companies House, bank, insurance, suppliers, customers, industry bodies.
  • Update Google Business Profile, website footer, email signatures (scheduled to switch on move day).
  • Order new stationery, business cards, and signage — delivered to the new address.
  • Colour-coded labelling plan for every workstation, filing cabinet, and archive box.
  • Book a professional deep-clean of the outgoing premises for the day after the move.

Two weeks out

  • Confirm move-day timings and access with both landlords, building managers, security.
  • Book any lift bookings, loading bay slots, and parking dispensations.
  • Full risk assessment and method statement submitted to facilities managers on both sides.
  • Distribute personal crates to every employee for their own desk contents.

One week out

  • All non-essential archive and stock moved in advance.
  • IT back-up of every server and workstation to secure off-site storage.
  • Final walk-through with the removals project lead.

Move day (and night)

  1. Staff finish work Friday 17:00 at old address.
  2. Apex crew arrives 18:00, packs, loads, transports overnight.
  3. Unloads Saturday morning, IT reconnects Saturday afternoon.
  4. Sunday: soft testing by IT and facilities.
  5. Monday 09:00: staff arrive at new address, everything reconnected exactly as it was.

Post-move

  • Dilapidations survey and hand-back of old premises within 5 working days.
  • Address change update to every regulatory body, insurer, and supplier.
  • Staff feedback survey within two weeks.
  • Post-mortem meeting with removals project lead — captures lessons for next time.

Why phase it around a weekend

Every hour of business downtime costs. Even a small 30-seat office loses roughly 240 productive hours for every single working day it can't trade. A weekend move — Friday evening load, Sunday reconnect, Monday morning trading — is almost always cheaper than a "cheaper" mid-week move that costs three days of lost productivity.

How Apex handles commercial moves

Every commercial relocation gets a named project lead, a written method statement, full public liability and goods-in-transit insurance, out-of-hours crews at no extra weekend premium, and desk-level photographic mapping so every employee's workstation is rebuilt to match. One fixed price. One signed contract. One weekend. Monday trading.

Frequently asked questions

How much notice do I need for an office move?
Six months is the professional minimum for a full commercial relocation. Anything shorter typically overruns budget or misses regulatory address-change deadlines.
How long does an office move take?
A typical UK SME office move is planned as a Friday-evening-through-Sunday phased move, with staff arriving at the new address on Monday morning to a fully reconnected working environment. Larger enterprise moves phase over 2–4 weekends.
Do I need to tell HMRC when my business address changes?
Yes. HMRC, Companies House, your bank, insurers, VAT registration, PAYE registration, and every regulatory body relevant to your industry all need formal address-change notification, ideally within 30 days of the move.